Artificial turf production and construction process description

January 01, 2022
Artificial turf is rich in variety, length is adjustable, and construction is convenient. It can be laid on asphalt and cement sites.
First of all, we understand the composition of the artificial turf. Artificial turf composition: plastic grass, lawn bottom, non-woven fabrics, seams cloth paste. Its paste precautions are as follows:
Before the paste, ensure that the surface of the non-woven fabric, seam cloth, and the bottom of the lawn is clean and dry without moisture. It is not appropriate to construct it under adverse weather such as wet rain or snow. The working temperature should be between 0-40°C. Inadequate bonding.
Artificial turf paste production and construction of concrete steps are as follows:
First, glue adhesive:
It is required to use a brush to brush at the bottom of the lawn with a uniform coating thickness, and it must not be repeatedly coated. Otherwise, it will cause blistering or even drop. The thickness of the glue must be strictly controlled. Pay attention to the speed of glue application. Apply to the two bonded surfaces. on.
According to the temperature, humidity and other conditions at the time to reasonably control the open time, generally 10-15 minutes for a good plastic coating, glue to eighty-nine percent dry hand touch is not suitable. Bonding requires one-time alignment and adhesion. Do not move the bonded object back after bonding.
Second, pressure curing:
After bonding, the surface debris is removed, and a special rubber hammer is used to hammer from both sides of the joint firmly to make the surface fully bonded and solidified. The curing time is generally three days, and the final strength of the test is generally ten days. Therefore, it is necessary to pay close attention to its maintenance during curing, to avoid excessive explosion, water invasion and movement, in order to achieve the best bonding state.
Third, cutting rest:
After the bonding, the cut pieces of the site are cleaned before the quartz sand and the rubber particles are filled.
Fourth, paving quartz sand turf paste rest, you need to use grass seedlings with special quartz sand fixed grass seedlings, so that the grass seedlings are not lodging, sand irrigation to the grass seedlings remaining height within 10mm, spread grass seedlings on the surface of rubber particles, Sprinkle should be uniform, and sand grains should not be poured between grass seedlings to prevent athletes from being injured.
V. Inspection and acceptance After the above steps, the turf laying process is basically completed. Finally, the entire turf needs to be inspected and checked. If problems are found, they should be promptly reported and corrected.
문의하기

Author:

Ms. Robin

Phone/WhatsApp:

+8618352579911

인기 상품
You may also like
Related Categories

이 업체에게 이메일로 보내기

제목:
이메일:
메시지:

Your message must be betwwen 20-8000 characters

홈페이지

Product

Phone

우리에 대해

문의

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

송신